Bathrooms, roofs, balconies, basements, wet areas and tanks. We seal the confirmed source as a tested system, then prove it holds before we hand it back.
Most waterproofing fails for one of two reasons. Either nobody found the real source first, so a good seal is applied to the wrong place, or the surface was not prepared and the membrane never bonded. Both leave you paying again within a season.
The Leak Lab treats waterproofing as a system, not a coat of product. Because we detect first, we seal the confirmed source. Because we prepare properly and test after, we hand back a seal that is proven, not assumed.
A seal is only worth anything if it is tested. Our method ties every waterproofing job back to the same standard. We prepare the surface correctly, apply the right membrane for the location, then flood test and confirm the area holds before it is closed and finished.
That final test is the difference between a seal that is assumed to work and a seal that is verified to work. It is why the seal carries a warranty you can rely on.
If a leak has been found and now needs sealing, that is reactive waterproofing and it sits here with The Leak Lab, tied to your detection report. If you are building or renovating and want areas sealed before anything has leaked, that is proactive project waterproofing, delivered through our parent company Fix It Mates within its contracting scope. Either way you deal with one accountable group.
Full wet area tanking under tiles, the most common failure point in Dubai homes.
Exposed and covered roofs, podium decks and terraces.
Sealing and fall correction where water is pooling and tracking inside.
Negative and positive side treatment for basements, sumps and water tanks.
Grinding, priming and crack treatment so the membrane actually bonds.
We hold water on the treated area and confirm it before sign off.

There is no single right waterproofing product, only the right system for the location, the substrate and the exposure. These are the systems we install across Dubai, selected after diagnosis and always flood tested before sign off.
Polymer modified cementitious coatings for wet areas, water tanks and concrete surfaces. Breathable, seamless and ideal under tiling.
Torch applied bituminous membrane for roofs and podiums, laid in overlapping rolls and sealed at every detail and upstand.
Cold applied seamless PU membranes for exposed roofs, balconies and complex details where sheet membranes cannot form.
Glass reinforced lining for water tanks, sumps and wet pits, giving a hard seamless waterproof shell.
A layered combination of membrane and protective screed used on Dubai roofs for durability under heat and foot traffic.
PU and chemical injection into cracks and joints to stop active water ingress from the negative side without excavation.


We confirm the fee and scope before we attend. The inspection fee is deducted from the works if you proceed.
Book an inspection





Wet area tanking under tiles, flood tested before sign off.
Positive and negative side treatment and injection for seepage.
Fall correction and sealing so water stops tracking below.
Seamless cold applied PU for exposed roofs and complex details.
Membrane and protective screed for roofs that take traffic.
Hard seamless shell for water tanks, sumps and wet pits.
Resin injected into cracks and joints to stop active leaks with no digging.
Dr Fixit, Mapei, Terraco, Polybit, Sika and Fosroc, matched to the job.
When a coating is right, and when a full membrane is needed.
The four systems that work on Dubai roofs, compared.
Book a professional leak investigation in Dubai. Thermal, acoustic and moisture mapping, with a signed report you can act on.